Email:
Louis@lithmachine.com
WhatsApp:
+86 18659217588
Wechat:
18659217588
Products
Home Products PVD Coater Thermal Evaporation Coating System

Benchtop Multi-Layer Thermal Evaporator Deposition Coating For Metals, Alloys & Dielectric Film

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Tel : +86 13174506016
  • Email : Louis@lithmachine.com
  • Whatsapp : +86 18659217588
  • Wechat : 18659217588
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Benchtop Multi-Layer Thermal Evaporator Deposition Coating For Metals, Alloys & Dielectric Film Benchtop Multi-Layer Thermal Evaporator Deposition Coating For Metals, Alloys & Dielectric Film Benchtop Multi-Layer Thermal Evaporator Deposition Coating For Metals, Alloys & Dielectric Film

Benchtop Multi-Layer Thermal Evaporator Deposition Coating For Metals, Alloys & Dielectric Film

  • ItemNo :

    Lith-SRT-300
  • MOQ :

    1
  • Compliance:

    CE Certified
  • Warranty:

    1 year
  • Delivery Time:

    5 days
  • Email :

    Louis@lithmachine.com
  • Whatsapp :

    +86 18659217588
  • Wechat :

    18659217588
  • Product Details

Benchtop Multi-Layer Thermal Evaporator Deposition Coating For Metals, Alloys & Dielectric Film



SRT-300-Multi-Layer Deposition for Metals, Alloys & Dielectric Thin Films


Product Overview

The SRT-300 is a desktop thermal evaporation system designed for high-precision thin-film deposition in research and small-scale production. Featuring a turbomolecular pump vacuum system and multi-source evaporation capabilities, it enables efficient deposition of metals, alloys, and dielectric films with minimal operator training.


Key Features & Advantages

1. Wide Application Range

· Materials Research: Metal films, dielectric layers, polymer coatings.

· Functional Devices: Thin-film sensors, optical coatings, nanoelectronics.

· Multi-Layer Deposition: Supports up to 99 layers in a single run.

2. User-Friendly Operation

· Plug-and-play design—no specialized lab environment required.

· 10-inch touchscreen for intuitive control and process monitoring.

· Preloaded 100+ deposition recipes for quick setup.

3. High Precision & Stability

· Quartz crystal monitoring ensures real-time thickness control (≤3% uniformity).

· Turbo-molecular pump (300L/s) achieves ≤6×10⁻⁵ Pa ultimate vacuum.

· 3 independent evaporation sources prevent material cross-contamination.

4. Flexible Configuration

· Optional: Co-evaporation for alloys, 400°C substrate heating, and cooled rotating stage.

· Automatic & manual modes for customized process control.

5. Low Maintenance & Compact Design

· Aluminum chamber for efficient heat dissipation.

· 65 kg weight, suitable for benchtop use in labs or offices.


Technical Specifications

Parameter

Specification

Chamber

Ø300 × 350(h) mm (quartz glass)

Vacuum System

300L/s turbomolecular pump + dual-stage rotary pump

Ultimate Vacuum

≤6 × 10⁻⁵ Pa (after baking)

Leak Rate

≤5.0 × 10⁻⁹ Pa·L/s

Deposition Rate

≥10 nm/min (material-dependent)

Film Uniformity

≤3% (with rotation)

Evaporation Sources

3 independent thermal sources

Max Layers per Run

99 layers (up to 4 materials)

Control Interface

10" touchscreen with programmable recipes

Power Supply

AC 230V, 32A, 50Hz

Cooling Water (Optional)

0.2 MPa, 15–25°C, ≥8 L/min


Operational Workflow

1. Automated Deposition: Pre-programmed vacuum pumping, heating, and evaporation.

2. Multi-Layer Control: Supports time-based or thickness-based deposition modes.

3. Remote Monitoring: Adjust parameters via network connection.


Why Choose SRT-300?

✔ Combines research-grade performance with desktop convenience.
✔ Minimal training required—ideal for multi-user environments.
✔ Scalable for both experimental and small production needs.


PVD System

PVD System





PACKAGE:
     1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
     2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
     3 Responsible for the damage during the shipping process, will change the damage part for you for free.
 

DELIVERY TIME: 15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity