Products
Home Products Supercapacitor Production Line

Tab Riveting & Forming Machine for Supercapacitor Tab Terminal Connections

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Tab Riveting & Forming Machine for Supercapacitor Tab Terminal Connections

Tab Riveting & Forming Machine for Supercapacitor Tab Terminal Connections

  • Product Details

Tab Riveting & Forming Machine for Supercapacitor Tab Terminal Connections



Application

The Tab Riveting & Forming Machine is designed for riveting tabs to lead terminals on prismatic cells and supercapacitors, ensuring secure and reliable electrical connections.

 

Key Features

  • Employs precision guide pillars and bushings to keep upper and lower dies perfectly parallel.
  • Comes with a positioning tray, ensuring cells are placed accurately during operation.
  • A PLC-controlled system guarantees reliable, stable performance with straightforward controls.
  • A color touchscreen LCD allows for intuitive operation and easy access to parameter settings.
  • Built on a high-strength steel welded frame, which is polished and powder-coated for a smooth, long-lasting finish.
  • Includes safety light curtains and protective doors to ensure safe operation.


Technical Specifications

Parameter

Specification

Maximum Die Stroke

100 mm

Pressure Hold Time

0–20 s (adjustable)

Production Capacity

≥ 3 pcs/min

Power Supply

220 V / 50 Hz

Power Consumption

500 W

Compressed Air Supply

0.5–0.7 MPa

Suitable Product Types

Prismatic batteries and supercapacitors

Note on Riveting

Should not deform aluminum tabs during operation






Supercapacitor Tab Riveting Machine








PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.