Products
Home Products Supercapacitor Production Line

Supercapacitor Aluminum Can Forming Machine: Shaping Platform Seats for Component Installation

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Supercapacitor Aluminum Can Forming Machine: Shaping Platform Seats for Component Installation

Supercapacitor Aluminum Can Forming Machine: Shaping Platform Seats for Component Installation

  • Product Details

Supercapacitor Aluminum Can Forming Machine: Shaping Platform Seats for Component Installation



Application

The Supercapacitor Aluminum Can Forming Machine is engineered to create precision platform seating within aluminum casings of supercapacitors. This specialized forming process ensures seamless integration of end caps, sealing O-rings, and insulating components, optimizing assembly efficiency and structural integrity.

 

Key Features

· Features a discharge mechanism—formed aluminum cans can be easily removed.

· Precision-mold design ensures accurate shell forming.

· Utilizes a four-column structure and precise guide bushings for stable vertical pressing and high accuracy.

· Equipped with PLC control and HMI touchscreen, enabling seamless automation.

· Built on a robust steel frame, featuring safety light curtains and double button activation for secure, reliable operation.

· Compact, elegant structure ideal for integration into production lines.


Technical Specifications

Parameter

Specification

Applicable Product

Diameter Φ60 mm, Height 50–140 mm

Utilization Rate

98%

Air Supply

0.5–0.8 MPa (adjustable)

Power Supply

220 V / 50 Hz

Power Consumption

2 kW

Machine Dimensions

800 × 700 × 1700 mm (L × W × H)

Weight

500 kg (approx.)






Supercapacitor Aluminum Can Forming Machine








PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.