ItemNo :
LITH-SD900CMOQ :
1Compliance:
CE CertifiedWarranty:
1 yearDelivery Time:
5 daysEmail :
Louis@lithmachine.com
ETD-2000III Triple-Target Ion Sputtering Coater – Product Specifications
Key Features
Technical Specifications
Parameter | Details |
---|---|
Target Materials | Standard: Au (50mm × 0.1mm) <br> Optional: Ag, Al, Pt, and more |
Target Size | 47mm diameter |
Control Mode | Manual operation |
Chamber Dimensions | Ø160mm × 120mm (H) |
Sample Stage | Adjustable (Ø50mm/70mm standard, customizable) |
Sputtering Gas | Ar, N₂, and others (selectable for different applications) |
Sputtering Current | Max 50mA (recommended ≤30mA) |
Deposition Rate | >40nm/min |
Vacuum System | High-performance vacuum pump included |
Why Choose the ETD-2000III?
✔ Multi-material coating – Deposit three different materials without breaking vacuum
✔ Enhanced SEM imaging – Reduces charging effects on non-conductive samples
✔ Precision control – Adjustable gas flow, current, and vacuum for optimal film uniformity
✔ Wide compatibility – Supports biological, polymer, and advanced material samples
Applications
Standard Package Includes
Optional Accessories
Note: The ETD-2000III is ideal for research labs, material science, and electron microscopy applications. Custom configurations available upon request.
Optimized for Performance · Designed for Researchers
(For detailed inquiries, contact our technical team for tailored solutions.)
Process
Power Processing→Power Grinding→Vacuum Mixing→Electrode Coating→Roll Press→Sheet Cutting→Vacuum Drying→Ultrasonic Welding→Electrode Winding→Spot Welding→Grooving→Glove Box→Electrolyte Injection→Electrode Diffusion→Hydraulic Sealing→Battery Analyzer
Related Machine
|
|
|
|
|
Electrode Slitting |
Welding Power: 80-6500W optional |
Lab cylindrical cell grooving machine |
Manual Sealing or Pneumatic Sealing Machine |
8 Channel Battery Tester
|
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME: 15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity