Email:
Louis@lithmachine.com
WhatsApp:
+86 18559646958
Wechat:
18659217588
Language: English
Products
Home Products Lab Furnace Debinding Furnace

Industrial 1100C Debinding & Pre-Sintering Furnace For Magnetic Powder

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Tel : +86 13174506016
  • Email : Louis@lithmachine.com
  • Whatsapp : +86 18559646958
  • Wechat : 18659217588
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Industrial 1100C Debinding & Pre-Sintering Furnace For Magnetic Powder

Industrial 1100C Debinding & Pre-Sintering Furnace For Magnetic Powder

  • Product Details

Industrial 1100C Debinding & Pre-Sintering Furnace For Magnetic Powder



Introduction

This furnace is primarily designed for the integrated debinding and pre-sintering processes of fine ceramic components made from aluminum nitride (AlN), silicon nitride (Si₃N₄), alumina (Al₂O₃), zirconia (ZrO₂), and dielectric ceramics. It is also suitable for the binder removal, pre-sintering, and sintering processes of ceramic powders, magnetic materials, LTCC, MLCC, NTC, NFC, ceramic cores, and other electronic components.

The furnace adopts a unique thermal field control method, which achieves excellent temperature uniformity during both low-temperature debinding and high-temperature pre-sintering, ensuring the precise thermal environment required for both process stages.

 

Specification

Model 1100 Debinding & Pre-Sintering Integrated Furnace

Equipment Model

Max. Temperature

Chamber Size (W×H×D)

Heating Method

Thermocouple

Voltage

Power

FXL(T)-60/11

1100℃

280×400×400 mm

Five-sided heating

Type K

380V

17 kW

FXL(T)-125/11

1100℃

380×500×500 mm

Five-sided heating

Type K

380V

25 kW

FXL(T)-300/11

1100℃

440×780×700 mm

Five-sided heating

Type K

380V

45 kW

FXL(T)-700/11

1100℃

700×1100×820 mm

Five-sided heating

Type K

380V

63 kW








PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.