Products
Home Products Battery Pilot Machine Line Pouch Cell Lab Machine

Pouch Cell Electric Stacking Machine For Battery Making

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Pouch Cell Electric Stacking Machine For Battery Making

Pouch Cell Electric Stacking Machine For Battery Making

  • Product Details

Pouch Cell Electric Stacking Machine For Battery Making


It is suitable for the stacking process of pouch cell. The positive and negative electrodes and separator are laminated or stacking in Z fashion.


Features

*Table type, can be placed on the ordinary desktop;

*The adjustment, operation and maintenance of the machine are simple and easy;

*It can be used in a wide range of laminations;

*High efficiency, with digital counter;

*Foot switch is used to control the action of air cylinder;

*The machine is small in size and beautiful in appearance;


Specifications

Stacking mode

 Z fashion

Suitable separator coil

Roll type separator, 3-inch roll coremax.φ200mm applicable

Applicable electrode size

Length:20~200mm

Width: 20~200mm

Thickness: within 18mm

Larger model for apply larger electrode is also available

Swing rod travel distance

300mm;

Power supply

AC220/110V; 50/60Hz

Power 

200W

Air pressure source

0.4MPa~0.7MPa

Machine dimensions

L650mmW400mmH700mm

Control box size

L200mmW300mmH380mm

Weight

30Kg

 



pouch cell stacking machine

pouch cell stacking machine


Pouch Cell Process: Tube Furnace/ Muffle Furnace→ Vacuum Mixing→ Electrode Coating→ Roll press→ Electrode Cutting→ Vacuum Drying→ Cases Forming→ Top&Side Sealing→ Electrolyte Filling→ Vacuum Sealing→ Battery Analyzer




For the pouch cell assembly, we also recommend you the following items:









PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.