ItemNo :
LITH-SK2-2-12TPRTB2MOQ :
1Compliance:
CEWarranty:
2 yearsDelivery Time:
5 daysEmail :
Louis@lithmachine.comLab 1200C Quartz Tube Vacuum Rotary Tilting Tube Furnace with Tilt Function and 205mm Heating Section
The picture is just for reference
Main parameter |
PN: SK2-12TPRTB2 Max.Temp: 1200C Working temperature:0-1100C The tube diameter:60mm The heating zone length:205mm Tube material:Quartz tube Heating rate:0~20 Degree/Min Voltage:220V,single phase 50/60HZ Heating element:Resistance wire Thermocouple:K type Max.vacuum:-0.1Mpa Temperature accuracy: ±1℃ Powder, 100g/h, material density 2kg/lL, material about 1L, The system needs to be sealed. |
||
Rotary system |
Tube rotate speed:0-20 RPM The tube can rotate 360 degrees,electric gear drive Push button control switch |
||
Tilting system |
Maximum inclination: 0-30° (adjustable) Bar-driven Push button control switch |
||
Feed system |
The motor drives the screw push rod to push the material into the tube With 1L Material tank |
||
Discharge system |
Flange with unloading tank, the furnace body is tilted to stir unloading |
||
Appearance design |
The electric furnace adopts humanized design, beautiful and easy to operate, and the outer layer of paint is sprayed with high temperature baking technology. High temperature resistance, oxidation resistance, acid and alkali resistance. Color selection is aging resistant tone, will not cause the appearance color fade due to a long time of use. |
||
Furnace chamber material |
Adopt the most advanced light alumina ceramic fiber in the world, with excellent thermal insulation effect, light weight, high temperature resistance, cold and heat resistance, no crack, no crystallization, no slag, do not worry about pollution of the fired products. The energy saving effect is 60-80% of the old electric furnace. |
||
Furnace chamber design |
Furnace adopts the stepped assembly structure, integrating the mechanical law, effectively ensure the furnace in the heating process of uniform force, ensure that the heat is not easy to disperse, prolong the service life of the furnace. |
||
Furnace shell structure |
Electric furnace shell adopts double layer forced air cooling structure, so that the electric furnace works at the highest temperature and the external temperature of the shell is close to room temperature, so as to avoid accidental injury. |
||
Sealing way |
Adopt 304 stainless steel ferrofluid flange, with easy loading and unloading, oxidation resistance, acid and alkali resistance, double seal, ensure the sealing |
||
Temperature controlling |
Adopt international advanced temperature controller, with 30 programmable PID self-tuning, automatic temperature rise, automatic temperature drop, no duty. |
||
Temperature control security |
The electric furnace adopts integrated circuit, module control, double circuit protection (partial temperature protection, ultra-high temperature protection, coupling protection, overcurrent protection, overpressure protection and other protection functions) to make the electric furnace work stable and reliable, safe. |
||
Warranty |
One year limited warranty with lifetime support, excluding heating element,cooling fans,thermocouple and quartz tube damaged by user. Attention: Any damages caused by the use of corrosive and acidic gases, and any damage from wrong operate and use are not under the coverage of One Year Limited Warranty. |
||
Certificates: CE,ISO&UL |
|
||
Standard Package Accessories: |
|||
Electric Furnace |
1 set |
|
|
High temperature gloves |
1 pair |
|
|
Crucible hook |
1 pc |
|
|
Quartz tube |
1 pcs |
|
|
Stainless steel flange |
1 set |
|
|
Tube stopper |
2pcs |
|
|
Feed and discharge system |
1set |
|
|
Vacuum pump |
1 set |
|
|
User manual |
1 book |
|
Please let me know your address in details,then we can send freight cost to you.
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.