ItemNo :
LITH-AFA-MC400MOQ :
1Email :
Louis@lithmachine.comVersatile Roll To Roll Pilot Coating Machine
LITH-AFA-MC400 is a versatile roll to roll coating system which can adapt various coating heads such as reverse comma blade, Doctor Blade, Slot Die and Micro Gravure and Tape Casting. A 4.5 meters long, three zone convection drying oven with independent temperature programming is implemented for efficient slurry curing. This is the most complete and universal pilot coating system that provides a broad adaptability to various coating slurries and film substrates (Cu, Al, PET, PP, PE).
Specifications:
Working Voltage |
110 - 240 VAC, 50/60 Hz, three Phase (380VAC three phase is available upon request) |
|
Max. Power Consumption |
30-35 KW ( 50A Air breaker required ) |
|
Compressed Air |
0.5-0.9 MPa is required (Air compressor not included.
|
|
Reeling/Unreeling Diameter |
|
|
Coating Width |
350mm Max. |
|
Coating Speed |
Max.5000mm/min |
|
Coating Heads
|
Doctor Blade Coating |
|
Reverse Comma Blade (Transfer Coating) |
|
|
Cast Coating |
|
|
Slot Die coating |
Attention: The final coating thickness is dependent on a wide range of parameters such as slurry viscosity, solid particle size, solid content, shim thickness, foil rolling speed and slurry feeding rate. Therefore, we are not able to guarantee that 1-micron level film is achievable for all kinds of slurries. For further discussion, please let us know your slurry specs and coating thickness requirement. |
|
Micro-Gravure Coating |
|
|
Convection Drying Oven |
|
|
Product Dimensions |
L6800mm x W1200mm x H1900mm |
|
Compliance |
|
|
Warranty |
|
|
Application Notes |
|
|
Net Weight |
13t |
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.