Products
Home Products Battery Pilot Machine Line Pouch Cell Lab Machine

Roll To Roll Electrode Die Cutting Machine for Punch Cell

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Roll To Roll Electrode Die Cutting Machine for Punch Cell

Roll To Roll Electrode Die Cutting Machine for Punch Cell

  • Product Details

Roll To Roll Electrode Die Cutting Machine for Punch Cell



Features

 1 The Automatic shear cutting machine is mainly used for lithium battery big electrode cutting after coating process or after continuous rolling press process. Cutting big electrode is easier to slit or punch small pieces for battery making.

2 LITH-DYG-140B model battery electrode cutting machine has a 500mm cutting width with set cutting length, it can be used for lithium battery lab research and production line.


SPECIFICATION

Model

Lithium ion Battery Electrode Cutting Machine  LITH-DYG-140B

Source voltage

AC 220V/110V, 50HZ/60HZ

Power

500W

Warranty

Two Years limited warranty with lifetime support

Max electrode width

500mm

Cutting material

Battery continuous or clearance cathode and anode electrode

Cutting speed

0-12m/min, adjustable

Cutting accuracy

≤±0.3mm

Dimension(L*W*H)

1450*1250*1050mm

Advantage

1 Driven by stepper motor feed, fixed-length precision is high

2 PLC control, set length, easy to operate, intuitive

3 With digital set fixed-length cutting, clearance trace length shearing

4 Pneumatic drive shear, little noise



Pouch Cell Process: Tube Furnace/ Muffle Furnace→ Vacuum Mixing→ Electrode Coating→ Roll press→ Electrode Cutting→ Vacuum Drying→ Cases Forming→ Top&Side Sealing→ Electrolyte Filling→ Vacuum Sealing→ Battery Analyzer




For the pouch cell assembly, we also recommend you the following items:









PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.