Products
Home Products Battery Lab Machine Line Cylindrical Cell Lab Machine

Quartz Split Test Cell For 26650 Cylindrical Cell

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Quartz Split Test Cell For 26650 Cylindrical Cell

Quartz Split Test Cell For 26650 Cylindrical Cell

  • ItemNo :

    EQ-SC-26650
  • MOQ :

    1
  • Compliance:

    CE Certified
  • Warranty:

    2 years
  • Delivery Time:

    5 days
  • Email :

    Louis@lithmachine.com
  • Product Details

Quartz Split Test Cell For 26650 Cylindrical Cell


Features

EQ-SC-26650 is designed for testing 26650 batteries. Its detachable design allows you to test the cycling behavior as well as structural changes of electrode easily and quickly.


Technology parameters

Dimensions (Dia. x Height)  

        1  ID of PTFE Body: 26mm

        2 Height of PTFE Body: 65mm

Material

        1  Caps: Full Stainless steel end caps

        2    Body: Eletrolyte corrosive-proof PTFE body can sustain with temperature up to 250ºC

        3  O-ring: Sealed by electrolyte corrosive-proof PTFE O-rings

Design

        1    Easy assembling by only four cap mounting screws

        2    Easy to separate after test for cleaning

        3    Space saving, compact design allows you put it into the glove box

Option

       Anti-corrosive Au coating on the top & bottom stainless steel caps is an option. Surcharge will apply.


How to make Split cylndral Cell

Split Test Cell




Quartz Split Cell Test

Cylindrical Cell Preparation






PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.