High Precision Dip Coater with 124L Oven for Large Substrate up to 16″ x 9″
- MOQ :
- 1
- Color :
- optional
- Port :
- Xiamen Port
- Compliance:
- CE
- Warranty:
- 2 years
- Delivery Time:
- 5 days
Product Description
Technical Parameter
|
Control Panel
|
· Working Voltage: 110-240V AC · Max. Power Consumption: 50W · Detachable Digital Controller offers flexibility · Programmable temperature controller, Forced air fan power adjustor, Temperature limit & alarm indicator, Incubate and dry function switch are included. (Please see the second picture below for details.
|
|
Traveling Distance |
0-250 mm Adjustable |
|
Dipping/Pulling Speed |
1-200 mm/min Adjustable |
|
Max. Working Temperature |
100°C (+/- 1.5°C accuracy) |
|
|
· One Polypropylene dip tank is included with dimensions of 17.25”(W) x 2”(D) x 9.5′(H) · Optional: temperature controlled recirculating pump for the coating slurry can be added inside chamber and tank at extra cost.
|
|
Max. Sample Size |
16″ x 9″ |
|
Max. Sample Weight |
5 kg |
|
Dipping/Pulling Motor |
Stepping Motor |
|
Oven |
· Working Voltage: 208-240V AC · Max. Power Consumption: 2300W · Chamber Dimensions: 500mm(L) x 450mm(W) x 550mm(H)– 124 Liter · Inner Material: Stainless Steel |
|
Product Dimensions |
636mm(L) x 680mm(W) x 915mm(H) |
|
Compliance |
CE Certified |
|
Warranty |
One year limited with lifetime support |
|
Application Notes |
· In order to get better film coating, the substrate shall be treated by plasma cleaner · Use ultrasonic processor to disperse nanopowder or homogenize solution to get better coating |
|
Net Weight |
91 kg (200 lbs) |
|
Shipping Dimensions |
40″(L) x 40″(W) x 60″(H) |
|
Shipping Weight |
182 kg (400 lbs) |
![]()

![]()

![]()
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers’ requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity



