Products
Home Products Battery Pilot/Production Line Cylindrical Cell Machine

Heat Roller Press Machine For Li Ion Battery Production

Heat Roller Press Machine For Li Ion Battery Production

Heat Roller Press Machine For Li Ion Battery Production

  • ItemNo :

    LITH-rolling1
  • MOQ :

    1
  • Lead Date :

    40 days
  • Compliance:

    CE
  • Warranty:

    2 years
  • Delivery Time:

    30 days
  • Email :

    Louis@lithmachine.com
  • Product Details

Heat Roller Press Machine For Li Ion Battery Production 



Characteristics of equipment

LITH-rolling1 adapt to continuous rolling process for all kinds of lithium battery anode and cathode.

1.   Rolling speed: 2~12r/pm, CVT adjustable.

2.   Roller material: 9 Cr2Mo, Roller surface hardness: HRC 65~68

3.   Gap adjustment method: Servo motor drive the middle wedge to adjust, mechanical self-locking. 

4.   Roller gap adjustment range: 0~2mm

5.   Roller gap adjustment accuracy:1μm

6.   Thickness uniformity of pole sheet after rolling: ≤±2μm. Maximum rolling form:3000 KN


 Specifications of roller:

Item Type

RM500

RM600

RM800

Roller size

500*500mm

600*600mm

800*800mm

Pole sheet width

200~500mm

200~550mm

300~750mm

Output speed

2~11rpm

2~10rpm

3~12rpm

Roll straightness speed

4~17m/min

4~19m/min

6~30m/min

Roller surface roughness

Ra≤0.2

Ra≤0.2

Ra≤0.2

Roll cylindrical degree

≤2.0μm

≤2.0μm

≤2.0μm

Roll thickness accuracy

±2.0μm

±2.0μm

±2.0μm

Roll pressure range

100~300t

100~300t

100~300t

Roll gap adjustment range

0~2.0mm

0~2.0mm

0~2.0mm

Roll gap adjustment accuracy

1μm

1μm

1μm

Tension adjustment range

2.2~20kg

2.2~20kg

2.2~20kg

Orderly winding error

±0.5mm

±0.5mm

±0.5mm

Retractable roll diameter

Max:Ø550mm

Max:Ø550mm

Max:Ø550mm

Air pressure

0.5MPA above

0.5MPA above

0.5MPA above

Power

15KW

18KW

35KW





Roller Press Machine










PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.