ItemNo :
LITH-GC650MOQ :
1Compliance:
CE CertifiedWarranty:
2 yearsDelivery Time:
5 daysEmail :
Louis@lithmachine.comCylindrical Cell Groover Grooving Machine Beading Machine For 18650 21700 26650 assembly
The Semi-Automatic Grooving Machine is designed for semi-automatic grooving of cylindrical steel shells (or aluminum capacitor cases) containing jelly rolls. It is suitable for evenly grooving cylindrical cells, and supports multiple cell types with interchangeable dies. The standard configuration supports 18650 batteries, and it can be adapted for other sizes by changing the dies.
· Adjustable grooving size with high precision and excellent dimensional stability.
· Supports various cylindrical cell types by replacing part of the dies.
· Compact, reliable, and aesthetically designed for safe and convenient use.
Item
Specification
Grooving Depth
1.2–2.0 mm (adjustable)
Grooving Width
1.1–1.5 mm (based on blade thickness)
Machining Accuracy
±0.1 mm
Blade Lifespan
>1,000,000 cycles
Production Capacity
Semi-automatic, up to 400 pieces/hour
Power Supply
AC 220V / 50Hz
Power Consumption
140 W
Compressed Air
0.5–0.7 MPa
Dimensions
600 mm × 450 mm × 350 mm
Net Weight
35 kg
Application
Key Features
Technical Specifications
Power Processing→Power Grinding→Vacuum Mixing→Electrode Coating→Roll Press→Sheet Cutting→Vacuum Drying→Ultrasonic Welding→Electrode Winding→Spot Welding→Grooving→Glove Box→Electrolyte Injection→Electrode Diffusion→Hydraulic Sealing→Battery Analyzer
Related Machine
|
|
|
|
|
Electrode Slitting |
Welding Power: 80-6500W optional |
Lab cylindrical cell grooving machine |
Manual Sealing or Pneumatic Sealing Machine |
8 Channel Battery Tester
|
|
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity