ItemNo :
LITH-ShrinkingMOQ :
1Compliance:
CEWarranty:
2 yearsDelivery Time:
5 daysEmail :
Louis@lithmachine.comAutomatic Cylindrical Battery Shrink Wrapping Machine For 18650 Production
Features
(1) High efficiency: the film efficiency is 50~70PCS/MIN. It is 6~10 times of artificial efficiency;
(2) High precision: the precision servo motor and high-precision mechanical structure make the film precision up to ±0.1MM, and the technology is leading the industry;
(3) Highly intelligent: the humanized operation interface is convenient for manual operation, the fault is automatically alarmed, and the fault point is clear at a glance;
(4) Simple operation and maintenance: the personnel can operate the equipment with a little training, and the maintenance is relatively simple;
(5) High flexibility of equipment: After replacing the fixture and mold, it can be adapted to cylindrical batteries such as AA, AAA and 18650.
Specifications
(Can be customized)
Model |
Lith-Shrinking |
Specification |
AA,AAA,18650 |
Film speed |
50~70PCS/MIN |
Film precision |
±0.1MM |
Power supply |
380V/220V |
Air pressure |
0.5~0.7Mpa |
Power |
9KW |
Weight |
800KG |
Machine size |
2100(L)*950(W)*1600(H) |
Casing requirements |
The width of the coil is 29.7±0.2mm, and the thickness of the single layer is 0.08±0.01mm. |
Insulation sheet coil size |
width between 20 ± 0.1mm (no material break and tape interface in the middle of the coil) |
Insulation sheet die size |
Outer diameter 17.4 ± 0.1 mm; inner diameter 10.5 ± 0.1 mm; inner and outer diameter concentricity ± 0.10 mm |
Heat shrinkable bottom edge size |
2.5mm ± 0.3mm (size error is related to casing material and baking conditions) |
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.