Products
Home Products NMP Waste Treatment System

5000 m³/h NMP Solvent Recovery System for Lithium Battery Production

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
5000 m³/h NMP Solvent Recovery System for Lithium Battery Production 5000 m³/h NMP Solvent Recovery System for Lithium Battery Production

5000 m³/h NMP Solvent Recovery System for Lithium Battery Production

  • ItemNo :

    LITH-GT-5000FL
  • MOQ :

    1
  • Compliance:

    CE Certified
  • Warranty:

    2 years
  • Delivery Time:

    2 days
  • Email :

    Louis@lithmachine.com
  • Product Details

5000 m³/h NMP Solvent Recovery System for Lithium Battery Production



 

I. System Function

This series of NMP recovery units utilizes the property that NMP is fully miscible with water to recover and treat exhaust gas emitted from coating machines. The system operates fully automatically to ensure operational stability and safety. It adopts a three-stage segmented spray absorption design, with final emissions significantly lower than national standards.

The system is composed of: ventilation ducts, recovery towers, pump units, blower, NMP liquid storage tank, and control system. The recovery unit offers high efficiency, low operational costs, compact footprint, appealing appearance, and superior performance. It is suitable for various environments and installation layouts, with simple operation, making it ideal for the coating processes of multiple lithium battery production lines.

 

II. System Configuration

1. Air Handling Capacity: 5000 m³/h
Model: LITH-GT-5000FL
Environmental Standard: GB 30484-2013 Emission Standard of Pollutants for the Battery Industry (non-methane total hydrocarbon concentration limit)

2. Main Unit Color: SUS gray

3. Functional Module Overview:

No.

Module

Function Description

1

Recovery Tower

Recovers NMP vapor and achieves compliant emissions through water spray adsorption

2

Pump Unit

Circulates and discharges water within the recovery tower

3

Blower

Delivers air to the recovery tower and maintains positive pressure in the coater

4

Storage Tank

Stores recovered NMP waste liquid

5

Control System

Automates operation between the recovery unit and the coater, maintaining stable oven and exhaust concentrations


4. Delivery List:

No.

Equipment Name

Model

Quantity

Remarks

1

Recovery Tower

LITH-GT-5000FL

1 set

SUS304

2

Blower

3KW

1 unit

Intelligent frequency control

3

Control Cabinet

NMP5K-1

1 set

Local + Remote Control

4

Water Pump

1.5KW

3 units

Chemical pipeline pump

5

Storage Tank

2m³

1 unit

SUS201

6

Discharge Pump

0.35KW

1 unit

Corrosion-resistant pump

 

5. Main Components – 4000 Air Volume NMP Recovery System: (Applicable here as shared model)

No.

Component

Specification

Quantity

Remarks

1

Tower Body

∅1.0m × H3.0m

3 units

SUS304

2

Corrugated Packing

φ1.0m × 20mm × 3 layers × 0.3mm

3 sets

SUS304

3

Wire Mesh Packing

φ1.0m × 20mm

1 set

SUS304

4

Water Pump

1.5KW

3 units

In-tank pumps

5

Online Concentration Detector

CM-800α

1 set

SZTMAX

6

Exhaust Fan

3KW

1 unit

Guangzhou XinFeng

7

Frequency Converter

3KW

1 unit

V&T

8

Control Cabinet

System Integrated

1 set

Q235, Outdoor

9

Liquid Circulation Piping

System Integrated

1 set

SUS304

10

Storage Tank

2m³

1 unit

SUS201

11

Liquid Level Alarm

-

1 set

TMAX

12

Discharge Pump

0.35KW

1 unit

Corrosion-resistant

 

III. Design Basis and Reference Standards

1. Complies with national, industry, and local regulations as well as client requirements.

2. Uses energy-efficient and easy-to-implement treatment methods to minimize power usage, capital investment, footprint, and operational complexity.

3. All mechanical and electrical components are selected from well-known, reputable brands to ensure reliability.

4. The system does not produce secondary pollution during construction or operation.

 

IV. Design Parameters

Item

Value

System Model

TMAX-GT-5000FL

Max Exhaust Treatment Volume

5000 m³/h

Single Tower Dimension

∅1.0m × H3.0m

Power Supply

380V / 3 Phase / 50Hz

Installed Power

7.5KW (4.5KW pumps + 3KW fan)

Operating Weight

2 tons

Floor Load Capacity

500 KG/m²

NMP Recovery Efficiency

≥ 99.6%

Recovered NMP Concentration

Adjustable 80%–90%

Tail Gas Emission Concentration

< 50 mg/m³

Soft Water Consumption

≤ 0.05 m³/h

Installation Dimensions

7m (L) × 2m (W)

 

V. Equipment Process Flow

1. Process Flow Diagram: (Image for reference only)


1. Installation Diagram: (Image for reference only)



VI. Working Principle of NMP Recovery Tower

1. The system recovers NMP by absorbing it into pure water. Waste gas enters from the bottom of the tower and passes through an adsorption unit where NMP dissolves into water and vapor. After treatment, the gas passes through a gas-liquid separator and a top rinsing stage to ensure complete NMP capture.

2. Because of the high temperature of the inlet gas, energy exchange during recovery causes some water evaporation. A circulation pump redirects liquid from within the tower back to the adsorption unit for reuse, enabling effective heat recovery, reducing water waste, and improving NMP concentration in the recovered liquid. Treated exhaust gas can be directly vented with near-zero emission.

 

3. Structure of the Tower:

The tower is composed of three key functional sections:

Spray Heat Exchange Zone: Allows rapid mass and heat exchange between NMP vapor and water. Direct contact eliminates heat transfer wall resistance, ensuring high efficiency.

Mass Transfer Separation Zone: Uses high-efficiency structured packing (specific surface area 140Y). Liquid flows downward while NMP gas rises in countercurrent, ensuring effective capture of vapor droplets.

Demisting Zone:

Lower demister uses baffles and inertia to remove droplets; airflow is zigzagged to force collection.

Upper demister forms spiral airflow that throws droplets to the sides into collection channels.

Demisting efficiency: 90%–99%.


VII. Control System

1. Electrical Panel Components:

No.

Component

Brand

Qty

Remarks

1

Electrical Components

Chint

1 set

 

2

Frequency Converter

V&T

1 set

 

3

NMP Liquid Sensor

Local

1 set

With lens cleaning unit

4

Valves

Local

1 set

 

 

2. System Control Description:

No.

Item

Technical Specification

1

Main Control Unit

Independent outdoor cabinet; remote start/stop near coater

2

Operating Modes

Manual, automatic, emergency stop, remote control

3

Waste Liquid Monitoring

Real-time display and configurable settings

4

Alarms

Sound and light alarms at coater; buzzer at outdoor cabinet

5

Safety Protection

Temperature alarm and power-off protection features









PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.