Products
Home Products Battery Large Production Line Cylindrical Cell Machine

200L Air-Driven Lid Lifting Device for Planetary Mixers

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
200L Air-Driven Lid Lifting Device for Planetary Mixers

200L Air-Driven Lid Lifting Device for Planetary Mixers

  • ItemNo :

    LITH- QTSJ200
  • MOQ :

    1
  • Compliance:

    CE
  • Warranty:

    2 years
  • Delivery Time:

    5 days
  • Email :

    Louis@lithmachine.com
  • Product Details


200L Air-Driven Lid Lifting Device for Planetary Mixers



Ⅰ. Equipment Features:

Application Scope

Lifting device for transfer tank lids.

 

Ⅱ. Main Technical Parameters:

Control System

Air Supply Pressure: 0.5 MPa ~ 0.6 MPa (dry compressed air)

Air Consumption: 15 L/min

Lift Operation Panel: Manual directional valve (with self-locking function)

Control Mode: Manual

Lifting Capacity: ≤ 360 kg

Total Machine Weight: Approx. 420 kg

Equipment Dimensions: L1290 mm × W1220 mm × H1691 mm (raised height: 2491 mm)

Appearance Color: Ivory white

Floor Load Capacity: 400 kg/m²

 

Ⅲ. Key Component Brands:

No.

Name

Specification

Material

Quantity

Remarks

1

Cylinder

ΦD×ΦN

Aluminum

1

Airtac

2

Pneumatic Valve

1

Airtac

 

 

Ⅳ. Supporting Conditions:

No.

Item

Standard Requirement

1

Workshop Height

> 2.5 m; Sufficient clearance for machine lifting and maintenance; Clean and level surface

2

Door Dimensions

Height > 2.0 m; Width > 1.0 m; To allow equipment access

3

Heating

In cold northern winters, indoor temperature must be > 20 °C to prevent grease from gelling in the cylinder and ensure smooth lifting and lubrication system operation

4

Installation Space

Arrange according to the general layout plan

5

Others

No corrosive gases or liquids, no explosive gases






PACKAGE:

     1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

     2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

     3 Responsible for the damage during the shipping process, will change the damage part for you for free.

 

DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity