ItemNo :
LITH-IronNiFoamDelivery Time:
2 daysEmail :
Louis@lithmachine.com
Quantity Discount is Available: >5pcs, 15% OFF
Quantity Discount is Available: >10pcs, 25% OFF and Free Shipping
For more product information and ordering detail, please contact: Louis@lithmachine.com
Features
1. Electromagnetic shielding
Magnetic radiation shielding efficiency ≥ 70dB.
2. Sound absorption and noise reduction
Sound absorption performance level I, noise reduction coefficient NRC0.8. It has excellent sound absorption and noise reduction.
3. Filtration performance
The distribution of foam metal pores can effectively block solid impurities in liquids and gases, and has high filtration precision.
4. Processability
It can be cut, bent, and simply pasted.
5. Fire resistance
Keep the shape stable, it is difficult to burn at high temperature, and it is resistant to high temperature.
6. Heat conduction and heat dissipation
Thermal conductivity 120-401w/m.k.
7. Corrosion resistance
The surface layer is compounded with nickel, chromium and other metals, which have high resistance to salt spray corrosion.
Specifications
Type |
Open cell |
Purity |
> 97% |
Form |
Sheet or Roll, depending on size & thickness |
Cell Size (PPI) |
5-150PPI, as per request |
Thickness |
Standard: 1-30mm Extra thin (<1mm) / Extra thick (>30mm) can be customized as request |
Size & Shape |
can be made in different shape as per request |
Porosity |
95%-98% |
Open Cell Rate |
≥98% |
Volume Density |
0.1-0.8g/cm3, as per request |
0.5mm*200mm*300mm |
1mm*200mm*300mm |
2mm*200mm*300mm |
3mm*200mm*300mm |
4 mm*200mm*300mm |
5mm*200mm*300mm |
6mm*200mm*300mm |
7mm*200mm*300mm |
8mm*200mm*300mm |
9mm*200mm*300mm |
10mm*20mm*300mm |
The size can be customized |
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damaged part for you for free.
DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to
production season and order quantity.