Products
Home Products Battery Large Production Line Cylindrical Cell Machine

Fission Modular Design Glove Box For Battery Production

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
Fission Modular Design Glove Box For Battery Production

Fission Modular Design Glove Box For Battery Production

  • ItemNo :

    LITH-A-014
  • MOQ :

    1
  • Compliance:

    CE
  • Warranty:

    2 years
  • Delivery Time:

    5 days
  • Email :

    Louis@lithmachine.com
  • Product Details

Fission Modular Design Glove Box For Battery Production 



Functions 
 This equipment is mainly used for drying room after the working process of the glove box production line, generally for multiple box combination form a relatively closed space, through operating the glove box to make the internal and external isolation. By connecting into the wind duct to the box body internal ventilation with low humidity wind, so as to maintaining product processing such as (inject electrolyte, standing, pre-seal) technical requirements: such as temperature and humidity, cleanliness and working environment.


Features
 Glove box is modular design, can be combined freely as required.
 Feeding the material box connected to the drying room not mixing plant and support.
 Work station of stainless steel 304, anti-corrosion.
 The barrel type transition warehouse, ensure internal vacuum - 90 Mpa.
 Gas spring switch on both sides of the door, convenient maintenance and cleaning.
 Automatic electrolyte-mixing system, remove air bubbles, prevent note liquid drops.


Technical Parameters(for reference)

ITEM

MAIN PARAMETERS

Measure

L*W*H:2000*1600*1900mm

Weight

1T

Power

AC220V ±10% 50HZ/60HZ, 1.0KW

Air source

0.6Mpa,30L/S

Applicable range

W300KG,H900mm





Cylindrical Cell Preparation








PACKAGE:

  1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

  2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

  3 Responsible for the damage during the shipping process, will change the damaged part for you for free.

 

DELIVERY TIME:15-20 days after confirming the order, detail delivery date should be decided according to 

production season and order quantity.