Products
Home Products Laboratory Equipment Laser Cleaning Machine

200W Fiber Laser Metal Clean Machine Laser Rust Removal Laser Decontamination Engraving

Product Categories

Contact Us

  • Contact Person : Louis Yang
  • Email : Louis@lithmachine.com
  • Address : No. 5 Nanshan Road, Huli District, Xiamen City, Fujian Province, China
200W Fiber Laser Metal Clean Machine Laser Rust Removal Laser Decontamination Engraving 200W Fiber Laser Metal Clean Machine Laser Rust Removal Laser Decontamination Engraving 200W Fiber Laser Metal Clean Machine Laser Rust Removal Laser Decontamination Engraving 200W Fiber Laser Metal Clean Machine Laser Rust Removal Laser Decontamination Engraving

200W Fiber Laser Metal Clean Machine Laser Rust Removal Laser Decontamination Engraving

  • ItemNo :

    LITH-OV-Q100
  • MOQ :

    1
  • Warranty:

    Two years limited warranty with lifetime technical
  • Delivery Time:

    5 days
  • Email :

    Louis@lithmachine.com
  • Product Details

200W Fiber Laser Metal Clean Machine Laser Rust Removal Laser Decontamination Engraving

Product Description

Model

OV Q100

OV Q300

OV Q500

Laser power

100W

300W

500W

Machine weight

50KG

150KG

200KG

Laser gun weight

1.5KG

1.5KG

1.8KG

 Working mode

Manual or auto

Cable length

3 Mtrs (can be lengthened)

Work distance

 150mm/250mm/500mm

Laser wavelength

1.064μm

Power supply

220V / 50Hz / 2A or 380V / 50Hz / 2A

Work temperature

5℃~45℃

Work humidity

<90%

Laser class

IV


 

Laser Rust Removal Machine Cleanlaser Similar Tool Cleaning Painted Metal Alloys


Samples

Laser Rust Removal Machine Cleanlaser Similar Tool Cleaning Painted Metal Alloys




PACKAGE:

     1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

     2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

     3 Responsible for the damage during the shipping process, will change the damage part for you for free.

 

DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity